The store will not work correctly in the case when cookies are disabled.
-
Home
-
Roof Vent Pipe Boot Product Specs & Dimensions
Roof Vent Pipe Boot Product Specs & Dimension
Plumbing Flange Product Data Information
Description
- Frost Resistant Design Prevents Freezing Over
- Patented Two Piece Telescopic Cover - All Design Provides Complete Enclosure of DWV Pipe and Roof Penetration Point.
- Permanent Three-Point Seal Unaffected by Daily Roof Movement and Structure Settling.
- No.1 style Ring Clamp Top Mechanically Seals DWV Pipe Orifice I.D. and O.D.
- Prestamped Base Flashing Raised Bosses Permanently Seal at Nailing Points.
- Installs Without Removal or Alteration of Existing Shingle Pattern. Fits All Architectural and 3 Tab Shingles.
- Folded Hip Corner Tabs Adjust Base to Fit Exact Roof Pitch.
- Suitable for New Construction, Tear-Off, and Retrofit.
- Retrofits Over Many Existing Flashings.
- Impervious to All Extreme Weather and Storm Conditions.
- 10 Year Warranty When Properly Installed.
- Installation Instructions Click Here
- Video of Pipe Boots
- Pipe Boot Plumbing Flashing Flyer
Standard Pitch Pipe Boot
Pictured in Copper
Steep Pitch Pipe Boot
Lead Top
Telescoping Sleeve
Physical Properties
- 16 oz. Copper
- 26 Gauge Galvanized
- Kynar Tough Powder Coating
- Lead Cap Stamped 2.5 lb Chemical Sheet. 99.6% Pure
- Ring Clamp Top
** CLICK HERE TO PURCHASE **
Special Pitch Pipe Boot
Standard Pitch Specs
Size | Pitch | Base Length | Base Width | Top Height | Sleeve Travel |
2" |
1/12-11/12 |
13.7" |
12" |
8" |
1-3" |
3" |
1/12-11/12 |
16.2" |
15" |
8" |
1-3" |
4" |
1/12-11/12 |
18.3" |
16" |
8" |
1-3" |
5" |
1/12-11/12 |
18.3" |
16" |
8" |
1-3" |
Steep Pitch Specs
Size | Pitch | Base Length | Base Width | Top Height | Sleeve Travel |
2" |
5/12-15/12 |
13.7" |
12" |
8" |
1-3" |
3" |
5/12-15/12 |
16.2" |
15" |
8" |
1-3" |
4" |
5/12-15/12 |
18.3" |
16" |
8" |
1-3" |
5" |
/12-15/12 |
18.3" |
16" |
8" |
1-3" |
Click Installed Pictures Below for Larger Images
Adjustable Triangular Cavity Fits Over the Existing Cheap Rubber Boot
INSTALLATION INFORMATION
- Cut vent pipe approximately 2" above top of base sleeve to allow for roof movement (expansion and contraction).
- Place flange on roof beside vent pipe to adjust exact pitch. Use hip corners to increase or decrease pitch.
- Place flange over pipe, rotate under at least one row of shingles.
- Center base sleeve around DWV pipe so there is approximately 1" of air space around perimeter.
- Install top sleeve. Tighten ring clamp.
- Nail base flashing to roof.
- Install PDF with Pictures Here
Why the Lead Top?
- Will Not Crack or Split from Sun or Weather
- Completely encloses the Top of Vent Pipe
- Allows Minimal Obstruction to Pipe Opening
- Malleable and Conforms to Inside of Sewer Pipe
- Ring Clamp Creates Double Seal of Pipe
- Long-Lasting: 30-50 Years
- Telescoping Design Allows the Lead Seal to Remain Undisturbed by Expansion and Contraction of the Roof